Permit record

Restaurant roof replacement and flashing

6469 Brentwood Stair Rd·Fort Worth·Tarrant County·PB26-11421·issued Aug 13, 2026
Declared valuation
$38,380
Permit type
Commercial Building PermitRemodelAssemblyRestaurant
General contractor
Not published
Scope of work

26G R-Panel Installation: • Remove and dispose of existing metal roof system, including panels, fasteners, and any underlayment down to deck. • Properly dispose of all removed roofing materials • Install self adhering hi-temp Polystick Ice and watershield membrane along all roofing facets. • Install new 26 gauge R-panel to match Whataburger colors Orange & White, ensuring proper alignment, spacing and fastening patterns. • Ensure all seams, edges and joints are properly sealed to prevent leaks. • Use recommended manufacturer fasteners in matching colors. • Fabricate and install 26 gauge flashings and trim as needed for exposed fastener roof system. • Detach and Reset gutter straps. • Fabricate and install 26 guage curbs around penetrations. • Replace all pipe jacks with metal roofing Decktite flashing. • Paint all penetration pipes with manufacture recommended paint. • Install foam closer strip on ridge line and transition flashing to properly seal. • Remove all tools, equipment, and debris from the site, ensuring the work area is clean and free of hazards. • Spire to provide roll off dumpster for duration of project. • Includes 2-year workmanship warranty. Versico PVC Versico 80 mil PVC Installation: • Other contractor to remove all units off of flat roof prior to PVC installation. • Remove existing roof system, Inspect substrate for appropriate nail-able surface. • Remove and replace any damaged wood decking. • Install 1/4" cover board mechanically attached with 3" plates following manufacture specs. • Install mechanically attached Versico PVC 80 mil on field with barbed plates per manufacture spec. • Terminate deck membrane inside back gutter with tbar. • Remove parapet wall interior siding and replace with osb. • Install fully adhered Versico 60 mil PVC going up and over parapet walls. • Terminate membrane on back scuppers with 90 degree TPO coated metal flashing • Install new coping cap in WB orange. • Install pitch pans and pipe boots where required and terminate with appropriate sealant and stainless steel clamps. • Other Contractor to re-install all existing mechanical units back onto flat roof area. • Leave behind 4" wide roll of PVC membrane to use as a sacrificial layer underneath all mechanical unit supports. • Other Contractor to re-install all existing electrical conduits, bracing, clamps, and electrical boxes. • Remove all tools, equipment, and debris from the site, ensuring the work area is clean and free of hazards. • Spire to provide roll off dumpster for duration of project. • Includes 2-year workmanship warranty. Whataburger to have other contractors remove all roof top units prior to roof installation Project requires a 7 day shutdown for metal replacement

Derived schedule

Trades this project needs

Windows estimated from the issue date using construction scheduling norms.

Demolition
medium confidence
$1,919
est. scope
Aug 13 – Sep 12open · 20d left
Roofing
medium confidence
$2,687
est. scope
Aug 27 – Oct 22opens in 4d

Want these before they go public?

Subscribers get each morning's permits the day they are indexed, filtered to their trade and counties, ranked by what the scope is worth.

See pricing